Supply, and Installation of HTC Ace Light Energy Saving High Bay Lights for Greencore Geothermal Power Plant Inc. located in Dumaguete

The picture above shows the newly installed ACE Light High Bay Lights 100w being measured by LCDC.

In 2012, Greencore Geothermal Powerplant, a former National Power Corporation (NPC) plant, was undergoing extensive rehabilitation and upgrading of its facilities.

As part of the upgrading, GGPI tapped the services of Leah Construction & Development Corporation in replacing its existing 400w Mercury Vapor lamps located at the turbine building.

In order to save energy consumption, LCDC supplied GGPI with HTC Ace Lighting from Taiwan.

HTC Ace Light was chosen by GGPI given its unique proposition of delivering high quality lighting such as a CRI of 80 – 90 while minimizing the energy consumption by at least 70%.

A total of 20 E.F. Lightning Terminals were installed to protect various structures such as administration offices, cooling towers, turbine buildings, and warehouses.

The project had a total budget of 1.3 million and was completed within 75 days.

Contact Us

Room 207 Jovan Condominium, 600 Shaw Blvd.,

Mandaluyong City
Metro Manila Philippines

Email: [email protected]

Call us today:

Working hour:

Monday - Friday: 08:00 - 17:00

Our Offices:

Room 207 Jovan Condominium, 600 Shaw Blvd., Mandaluyong City Metro Manila Philippines