Key Projects: Design, Supply, and Installation of Lightning Protection System for Energy Development Corporation Geothermal Power Plants located in Ormoc, Leyte
In 2013, after the devastation done by Typhoon
Haiyan (Yolanda), Leah Construction &
Development Corporation was tapped by Energy
Development Corporation to rehabilitate all
existing lightning protection system for 4 plants
located in Ormoc, Leyte namely Tongonan,
Mahangdong, Upper Mahiao, and Malitbog
Plants.
This was an extremely important project as this
was part of the efforts to energize the ravaged
areas of the typhoon within a set period. Given
LCDC’s expertise in lightning protection, we were
once again chosen to be the preferred supplier
for this project.
One of the challenges for LCDC this time was
mobilizing during the holidays and at a time when
some areas of the site where not passable and
reachable. Further, electricity was still not
available.
Despite these challenges, LCDC was able to install
a total of 42 E.F. Lightning arresters in various
structures such as administration offices, cooling
towers, turbine buildings, and warehouses.
The project had a total budget of 18 million Php
and was completed within 90 days.