Supply and Installation ACE LIGHT CMH for Energy Development Corporation Geothermal Power Plants located in Ormoc, Leyte
In addition to the lightning protection systems installed at the Leyte plants, LCDC was tasked to rehabilitate the lighting systems of the plants that was damaged by typhoon Haiyan.
Majority of these lighting systems were the rehabilitiation of perimeter and flood lights into Energy Saving Lighting fixtures that would give an ROI of 2 – 3 years.